  • The timber pagoda at Southbank Parklands after its stain and varnish

    Southbank, QLDCommercial

    Southbank Parklands Pagoda

    Profile Build Group were engaged to complete maintenance works to the Southbank Pagoda due to general deterioration from weather and age.

    The repairs conducted were as follows:

    1. Sanded back and cleaned the existing timber structure prior to recoating
    2. Stain and varnish internal and external of existing timber structure to bring it back to new condition

    The works were completed after hours to minimise disruption.

    The timber pagoda at Southbank Parklands after its stain and varnish
  • New Farm, QLDCommercial · Internal Trades

    Painting Restoration

    1. Full high end painting restoration project, internally and externally to a pre-war colonial home in New Farm established in 1920
    2. Extensive preparation works were required due to the age of the building, including lead removal of existing lead based coatings
  • Inside the Southbank Piazza, its steel structure repainted

    Southbank, QLDCommercial

    Southbank Parklands Piazza

    Profile Build Group were engaged to complete maintenance works to the Southbank Piazza due to general deterioration from weather and age.

    The repairs conducted were as follows:

    1. Sanding and degreasing all existing steel work
    2. Rust conversion
    3. Preparing and painting the entire metal structure with a two-pack high performance epoxy designed for industrial and marine environments that are susceptible to UV exposure and the elements

    The works were completed after hours to minimise disruption.

    Inside the Southbank Piazza, its steel structure repainted
  • The Carrara stadium bowl and grandstands during construction for the Commonwealth Games

    Carrara, QLDCommercial

    Commonwealth Games

    Profile Build Group were engaged to supervise and project manage trades during construction of the Commonwealth Games. One of our largest jobs was installing non-slip coatings to stair treads and walkways to the stadium days before the games commenced. This also involved liaising with multiple trades, engineers and certifiers. Profile Build Group sourced the materials, and installed these in record time, to ensure safety for the thousands of spectators that occupied the grandstands.

    The Carrara stadium bowl and grandstands during construction for the Commonwealth Games
    The Carrara stadium field and running track during construction
  • The Airlie Beach clock tower after repair and repainting

    Airlie Beach, QLDCommercial

    Clock Tower

    Profile Build Group were engaged to repair and restore the Airlie Beach clock tower. The repairs involved:

    1. Sanding and degreasing all existing steel work
    2. Rust conversion
    3. Preparing and painting the entire metal structure with a two-pack high performance epoxy designed for industrial and marine environments that are susceptible to UV exposure and the elements
    The Airlie Beach clock tower after repair and repainting
  • St Lucia retaining wall: the failed wall in rubble, then the new wall and concrete pathBefore & after

    St Lucia, QLDCommercial

    Retaining Wall

    Profile Build Group were engaged to complete repairs to a retaining wall that was dangerously close to falling over onto an access path due to structural instability.

    The following was involved to remediate this damage:

    1. An engineer was engaged to provide recommendations and drawings
    2. The wall was demolished and a new wall was installed as per engineer drawings and specifications.
    3. A tree was removed and other trees trimmed
    4. New plumbing for storm water was installed
    5. A new concrete pathway was constructed
    6. Liaising with building certifier, structural engineer and council to complete works and receive approvals
    Before: St Lucia retaining wall: the failed wall in rubble, then the new wall and concrete path After: St Lucia retaining wall: the failed wall in rubble, then the new wall and concrete path
    The new retaining wall and path at St Lucia
  • Arana Hills: the worn paved path, then the new concrete pathBefore & after

    Arana Hills, QLDCommercial

    Concrete Path Replacement

    Profile Build Group were engaged to replace a shopping centre paved pathway with a concrete pathway due to damage caused from age, wear and tear and general earth movement.

    The following was involved to remediate this damage:

    1. The site was secured with temporary fencing, and the works conducted in stages to ensure no disruption to the businesses
    2. Earthworks were completed
    3. The existing pathway and stairs pavers were removed and disposed of
    4. The concrete pathway, including formwork, was completed
    Before: Arana Hills: the worn paved path, then the new concrete path After: Arana Hills: the worn paved path, then the new concrete path
  • Paddington balcony: a rusted post in concrete cancer, then new aluminium balustrading and tilesBefore & after

    Paddington, QLDCommercial

    Balustrading Repairs

    Profile Build Group were engaged to remove and replace existing damaged balconies including balustrading, tiles, timber framing and provide general maintenance to unit balconies due to age and rust.

    The following was involved to remediate this damage:

    1. Remove concrete cancer and re-render
    2. Fabrication of new aluminium balustrading and brackets
    3. Supply, disconnect and reconnect lights to balconies
    4. Painting of posts, ceilings, slab and fascia’s
    5. Apply a waterproof membrane
    6. Re-tile all balconies
    Before: Paddington balcony: a rusted post in concrete cancer, then new aluminium balustrading and tiles After: Paddington balcony: a rusted post in concrete cancer, then new aluminium balustrading and tiles
  • Banyo: the metal awning bent by a reversing truck, then the new awningBefore & after

    Banyo, QLDCommercial

    Awning Replacement

    Profile Build Group received a make safe request after a truck had reversed into the metal awning above the front door of the building. The metal awning had been bent and the occupants were concerned that the sheet metal could come loose, causing injury.

    The following was conducted to remedy the issue:

    1. Profile Build Group’s make safe team was dispatched immediately to site, and temporary fencing was used to restrict access to the area to prevent injury if the awning fell.
    2. The sheet metal was cut free, and the sharp metal was disposed of safely
    3. A new awning and frame was then manufactured and installed including painting to the original colour
    Before: Banyo: the metal awning bent by a reversing truck, then the new awning After: Banyo: the metal awning bent by a reversing truck, then the new awning
  • Richlands, QLDCommercial

    External Repairs

    Profile Build Group were engaged to complete maintenance works to a residential complex with 30+ townhouse units due to general deterioration from wear and tear and age.

    The repairs conducted were as follows:

    1. External render repairs to majority of units, including repairs to cracked, poorly installed and weather related wear of render
    2. Internal plaster and painting repairs to majority of units
  • A brick home at Jones Hill with its replaced corrugated roof

    Jones Hill, QLDInsurance · Internal Trades

    Hail Damage Claim

    Profile Build Group were engaged to complete a roof replacement, following the Gympie Hail Storm that occurred in 2018. The roof was severely hail damaged and the entire roof required replacement. Profile Build Group engaged expert trades to source, remove and replace the corrugated metal roof sheeting with an identical match to the prior roof.

    A brick home at Jones Hill with its replaced corrugated roof
    New corrugated roof sheeting at Jones Hill after the Gympie hail storm
    Roof edge and safety rail on the Jones Hill roof replacement
  • New roof sheeting at Strathdickie with scaffold in place

    Strathdickie, North QLDCatastrophe · Insurance · Internal Trades

    Roof Replacement

    Profile Build Group were engaged to complete repairs as a result of Tropical Cyclone Debbie which affected the area in March 2017 and the entire roof required replacement. Profile Build Group engaged expert trades to source, remove and replace the corrugated metal roof sheeting, existing water tanks, gutter guard and including internal painting works.

    New roof sheeting at Strathdickie with scaffold in place
    The finished roof at Strathdickie with the hills behind
  • Cabarita Beach unit: water-damaged timber floor, then the replaced floorBefore & after

    Cabarita Beach, NSWEscape of Liquids · Insurance

    Water Damage Claim

    Profile Build Group received approval to conduct repairs following a water damage claim which affected a number of units in an apartment complex. The following repairs were organised:

    1. Removal of water and mould affected areas
    2. Restoration and drying works, including sanitising and installation of drying equipment
    3. Joinery and carpentry repairs
    4. Plastering and painting throughout the units
    5. Kitchen cabinetry removal and replacement within multiple units
    6. Replacing timber flooring throughout the entirety of the units
    Before: Cabarita Beach unit: water-damaged timber floor, then the replaced floor After: Cabarita Beach unit: water-damaged timber floor, then the replaced floor
  • Currumbin duplex hallway stripped to the frame after a burst pipe, then finishedBefore & after

    Currumbin, QLDEscape of Liquids · Insurance

    Water Damage Claim

    Profile Build Group were engaged to conduct repairs following a water damage claim as a result of a burst water pipe. The following repairs were conducted to the entire duplex:

    1. Removal of water and mould affected areas
    2. Restoration and drying works, including mould remediation, sanitising and installation of drying equipment
    3. Joinery and carpentry repairs
    4. Plastering and painting
    5. Kitchen cabinetry removal and replacement
    6. Laundry removal and replacement
    7. Replacing timber flooring throughout the entire duplex
    8. Plumbing repairs
    9. Electrical repairs
    10. Air-conditioning replacement
    Stripped: Currumbin duplex hallway stripped to the frame after a burst pipe, then finished Finished: Currumbin duplex hallway stripped to the frame after a burst pipe, then finished
    The rebuilt kitchen in the Currumbin duplex
  • Mount Isa club: a stripped bathroom and the dining room after the storm repairs

    Mount Isa, North QLDCatastrophe · Escape of Liquids · Make Safes

    Storm Damage Claim

    Profile Build Group were engaged to conduct a make safe following the weather event that affected Mount Isa and Townsville in February 2019.

    The following repairs were conducted:

    1. Electrical disconnect of water affected items
    2. Fire system repairs
    3. Mould remediation
    4. Removal of water damaged ceiling linings
    5. Cleaning of carpets and floor coverings
    6. Make safe to poker machine room
    Mount Isa club: a stripped bathroom and the dining room after the storm repairs
    The dining room of the Mount Isa club after repairs
  • The extraction truck at the South Brisbane sewerage make safe

    South Brisbane, QLDEscape of Liquids · Make Safes · Restoration

    Sewerage

    Profile Build Group were engaged to conduct an emergency make safe following a blocked waste pipe which as a result flooded two units and common area hallway with raw sewerage. The following was conducted to make safe:

    1. Extraction of raw sewerage to all areas
    2. Removal of blocked and damaged plumbing
    3. Removal of carpets, floor coverings, walls, doors and other affected areas
    4. Clean and sanitise all surfaces
    5. Water extraction to lift shaft pit and sanitise
    6. Decommission and recommission the lift
    The extraction truck at the South Brisbane sewerage make safe
  • Painted townhouses at the Everton Hills complex

    Everton Hills, QLDCommercial

    Interior & Exterior Works on New Build

    Profile Build Group were engaged to complete the following works at a brand new 31 unit complex to bring the job to completion:

    1. Exterior painting works to all units, including preparing and painting all surfaces
    2. Staining and coating the 2nd storey decking to all 31 units
    3. Preparing and painting to all areas of the internals of all 31 units
    Painted townhouses at the Everton Hills complex
    A painted townhouse at Everton Hills with its blue garage door
    A painted kitchen and living area inside an Everton Hills unit
    A painted upstairs room opening onto the stained deck at Everton Hills
  • Paddington, QLDCommercial

    Pool Installation

    Profile Build Group were engaged to design and install a new pool in its entirety, including the landscaping and surrounding areas. This involved the following works:

    1. Formwork and framing of the pool
    2. Concreting
    3. Specialty pool plumbing and electrical works
    4. Decking and tiling
    5. Fencing
    6. Landscaping
  • North QLDCatastrophe · Insurance

    Cyclone Debbie

    1. Completed 270 emergency Make Safes within 7 weeks
    2. 396 Cyclone Debbie related repairs with 8 months
    3. Profile Build Group emergency crews comprising of electricians, builders and plumbers were deployed and on the ground within 48hours of the cyclone
    4. Employees and trades were stationed in Mackay, Airlie Beach, Bowen and Hamilton Island for the duration of the CAT event repairs
  • Airlie Beach: the roof torn off by Cyclone Debbie, then new decking going downBefore & after

    Airlie Beach, QLDCatastrophe · Insurance

    Cyclone Debbie

    1. Tropical cyclone Debbie winds and torrential rain caused the roof of the dwelling to be completely torn from the property.
    2. Profile Build Group’s emergency response team attended and made safe all electrical components, boarded up the windows and sealed the roof with a tarp to prevent further water ingress and damage to the property.
    3. Profile Build Group quoted the full scope of works to be completed for the repairs.
    4. Completion of the project included extensive repairs of the entire internal and external of the property including the replacement of the roof, replastering and repainting internal.
    5. Replacement of all external cladding and repainting of the external of dwelling.
    After the cyclone: Airlie Beach: the roof torn off by Cyclone Debbie, then new decking going down Re-roofing: Airlie Beach: the roof torn off by Cyclone Debbie, then new decking going down
    A roof at Airlie Beach covered by a make-safe tarp after Cyclone Debbie
  • The six-storey unit complex whose tiled roof was repaired

    Hervey Bay, QLDCommercial

    Tiled Roof Repairs

    1. Tiled Roof Repairs to 6 storey unit complex
    2. Grind all ridge capping, remove and replace broken roof tiles, remove and replace broken ridge capping
    3. Repointing of all ridge caps to the entire complex including all safe working at heights procedures
    The six-storey unit complex whose tiled roof was repaired
  • The fire-damaged kitchen in the Taringa unit

    Taringa, QLDMake Safes

    Fire Damage Claim

    Profile Build Group were engaged to perform an emergency make safe due to a fire within a unit complex as a result of an electrical appliances. The following repairs were conducted to make safe:

    1. Electrical disconnect throughout the unit
    2. Removal all fire damage surfaces to all rooms, including wall and ceiling linings, appliances, doors and kitchen and bathroom fixtures
    3. Cleaning and deodorising of all frame work
    4. Replacement of security screens to make safe
    5. Removal of all fire and smoke damaged debris from site
    The fire-damaged kitchen in the Taringa unit
    The Taringa unit stripped back after the fire
  • Drying equipment set up, and water lying on the floor, at Mount Gravatt

    Mount Gravatt, QLDEscape of Liquids · Major Loss · Make Safes · Restoration

    Water Damage Claim

    Profile Build Group were engaged to conduct a make safe following water ingress as a result of a blocked drain to a rooftop terrace BBQ area. Water cascaded down the lift shaft, causing damage to common area hallways throughout the entire building.

    1. Unblock the drain to the rooftop terrace BBQ area
    2. Perform electrical make safe, including engaging a lift technician to conduct emergency lift repairs
    3. Water extraction to lift shaft
    4. Water extraction to all common area hallways and structural drying
    Drying equipment set up, and water lying on the floor, at Mount Gravatt
    A lift lobby and common hallway at Mount Gravatt after drying
  • Corinda: a garage door smashed by a car, then boarded up with ply and signedBefore & after

    Corinda, QLDMake Safes

    Impact Damage Claim

    Profile Build Group were engaged to complete an emergency make safe after a vehicle had impacted both the front roller door and exited the rear solid wall in a garage. The following was completed:

    1. Immediate attendance to site to assess the scene and make a plan of works
    2. Carpenters – Boarded up the walls using solid ply sheeting
    3. Temporary fencing installed and signage fitted to ensure safety
    4. The area cleaned and debris removed to ensure safety
    5. Re-framing of the rear elevation wall and install wall sarking
    6. Installing new rear door and hardware, plasterboard sheeting and exterior weatherboards to return the property to match existing
    7. Supply and install new electric garage door including new tracks and motor
    8. Repair damage to external timber fencing
    9. Repair internal plasterboard walls
    10. Painting of the garage internally and externally to match existing

    The repair quotation was prepared and submitted to the loss adjustor as a matter of utmost importance. The quotation was approved and the following repairs were completed.

    Hit: Corinda: a garage door smashed by a car, then boarded up with ply and signed Made safe: Corinda: a garage door smashed by a car, then boarded up with ply and signed
    Before: Corinda: the car inside the damaged garage, then the garage cleared and rebuilt After: Corinda: the car inside the damaged garage, then the garage cleared and rebuilt
  • Northern NSWCatastrophe · Escape of Liquids · Make Safes

    Storm Damage

    Profile build Group were engaged to attend site to conduct an emergency Make Safe after high forced winds removed metal roof sheets during a storm causing water ingress through the ceiling below.

    Profile Build Group’s team attending site to complete the following Make Safe Repairs:

    1. Electrical disconnect throughout the affected areas
    2. Tarping of the roof using specialised Make Safe tarp
    3. Removal of water damaged ceiling linings due to threat of collapse
    4. Boarding up of ceiling cavity to mitigate loss
    5. Removal of debris and damaged roof sheets from site
  • Chermside, QLDMake Safes

    Break & Enter

    Profile Build Group were engaged to attend to an emergency Make Safe after a break and enter. After police attended, our team attended site as a matter of urgency and completed the following;

    1. Attended site to board up the opening to secure the property as temporary measure
    2. Organised Fire Door supplier to attend site, supply, install and certify on the same day
    3. Lock Smith attended site to install new cylinder and locking mechanisms
    4. Liaised with Police to finalise report to enable a smooth and prompt progression of claim
  • Caloundra: a balcony slab edge with spalled concrete, then repaired and paintedBefore & after

    Caloundra, QLDCommercial

    Concrete Spalling Repairs

    Profile Build Group were engaged to complete Concrete Spalling Repairs to various areas of the complex and to the concrete formwork ceiling of a basement carpark using HB 40 Render Rock including cleaning steel rebar and prime. The repairs required abseiling to carry out the repairs. On completion the slab edge, soffits to front balconies, basement ceiling and external walls were painted to match the rest of the property.

    Before: Caloundra: a balcony slab edge with spalled concrete, then repaired and painted After: Caloundra: a balcony slab edge with spalled concrete, then repaired and painted
    Repaired and painted balcony soffits at Caloundra
  • North Brisbane, QLDInsurance

    Fire Damage Claim

    1. After a fire broke out in a large residential unit complex in North Brisbane, Profile Build Group dispatched our emergency crew including builders and electricians who were onsite within an hour to attend to the emergency Make Safe
    2. Emergency electrical repairs and demolition of the fire and smoke damaged areas to the unit complex were carried out
    3. Profile Build Group liased with insurers and loss adjustors to quote on the repairs, and saw the claim through to completion
  • Gympie, QLDCatastrophe · Insurance

    Hail Storm

    1. Emergency make safes were conducted to prevent further damage, including tarping of roofs, electrical make safes and tree removal from houses
    2. After the initial event, Profile Build Group assisted insurers and loss adjustors to provide quotations for hail damage repairs to the region, incorporating the assistance of local trades and specialist trades travelling to the region as required
  • Townsville, QLDCatastrophe · Escape of Liquids · Insurance

    Floods

    1. Within 24 hours of the event striking the region, Profile Build Group’s make safe team was dispatched to Townsville to commence emergency make safe repairs including electrical disconnections, emergency restoration services and roof tarping as the event unfolded
    2. After the initial event, restoration works commenced to restore sanitation to affected homes, and liaising with insurers began to commence repairs
    3. Our team was stationed in the Townsville region for the entire event, and saw claims through from make safe to completion
  • New Farm, QLDMajor Loss · Restoration

    Fire Damage

    Profile Build Group were engaged to conduct fire and smoke damage restoration cleaning to multiple areas after a fire occurred in the basement car park level of a residential unit complex. Multiple areas of the complex were affected, including the entire basement car park, lifts and lift shafts, common area hallways and specific units and balconies.

07 3638 0304What happened?

Tell us what happened